From drive test to optimisation: building a workflow that produces decisions

Most teams already own the tools. What they lack is a workflow where the output of one stage is the defined input of the next — and that gap is where weeks disappear.

Mersun Telecom Solutions · Updated October 2026

TL;DR

What should be decided before any data is collected?

Three things: the KPI definition set, the route plan and the pass/fail thresholds. If these are decided after collection, the data will almost always turn out to be missing something — a route that did not cover the target cluster, a KPI that cannot be computed from the logs captured, a threshold nobody agreed on.

The KPI definitions matter most because they are the hardest to change later. Event detection parameters — what counts as a dropped call, a handover failure, a throughput degradation — determine every number downstream. Locking them before testing is what makes results comparable across clusters, quarters and vendors.

Stage Question it answers Typical tool
PlanningWhere should the network be and how should it be configured?ATOLL
CollectionWhat is the network actually doing on the ground?TEMS Investigation, TEMS Pocket, Nemo Handy
Post-processingWhy is it doing that, and where is the worst of it?ACTIX Analyzer, TEMS Discovery
Acceptance reportingDoes it meet the contractual thresholds?ACTIX Analyzer reporting

Where does post-processing fit?

Post-processing turns logs into comparable measurements. It is where multi-vendor normalisation happens, where KPIs are computed against the locked definitions, and where the difference between a network fault and a device fault becomes visible.

The common mistake is treating post-processing as reporting. It is not: reporting is the output of post-processing, and if the two are the same step, the analysis is usually too shallow to explain anything. The useful post-processing output is a ranked list of problems with evidence, not a KPI table.

How does optimisation connect back to planning?

Optimisation findings should feed the planning model, not just the parameter database. If measurements consistently show weaker coverage than predicted in a particular clutter type, the propagation model is wrong and the next cluster will inherit the same error.

This feedback loop is what separates teams that improve over a rollout from teams that fight the same problems in every cluster. It requires the measurement and planning tools to share a data format, which in practice means choosing tools that can exchange data rather than assuming someone will reconcile spreadsheets afterwards.

In multi-country programmes the workflow is where consistency is won or lost. A group operating in four markets with four local engineering teams will produce four incompatible KPI definitions unless the definition set is centralised and enforced by the tooling. Deciding that centrally is cheaper than reconciling it annually.

Where does acceptance reporting belong in the workflow?

At the end, and automated. If acceptance reports are assembled manually from exported data, the effort scales with the number of clusters and the consistency degrades as the programme grows. If they are generated from the same locked KPI definitions used in analysis, they cost almost nothing to produce and they are comparable by construction.

This is the practical argument for a post-processing tool with a configurable KPI engine rather than one with fixed reports: the report format changes between contracts far more often than the analysis does.